Malawi
Articles |
10.4.1
–
10.4.2
–
10.4.3
–
10.4.4
View measure text |
---|---|
Indicative date of implementation | 22 February 2021 |
Definitive date of implementation | 22 February 2025 |
Assistance required for implementation | Support for designs, acquisition of IT infrastructure, establishment and trainings. |
Donor / Agency |
To be determined |
Progress reported |
31 May 2023 — G/TFA/N/MWI/4/Rev.1The Ministry of Trade embarked on establishment of the Electronic Single Window system in the country. Feasibility study was completed in 2019 and implementation structures put in place in 2020. The project implementation is in progress amid tight budget.Vendor to develop the National Single Window software has been procured. Technical Assistance required: Capacity building for officers operating the national single window and acquisition of infrastructure. 30 June 2021 — G/TFA/N/MWI/4The Ministry of Trade embarked on establishment of the Electronic Single Window system in the country. Feasibility study was completed in 2019 and implementation structures put in place in 2020. The project implementation is in progress amid tight budget. The project is being financed by the Malawi Government through a loan obtained from the World Bank Group.Technical Assistance required: Support for designs, acquisition of IT infrastructure, establishment and trainings. |