Guyana
Articles |
8.2 (b)
View measure text |
---|---|
Indicative date of implementation | 22 February 2020 |
Definitive date of implementation | 22 February 2027 |
Shift | Shift from Cat. B to Cat. C notification. |
Assistance required for implementation |
Technical Assistance is required: • Enactment of the relevant procedures regulations to guide operations between bordering countries. |
Donor / Agency |
To be determined |
Progress reported |
9 November 2020 — G/TFA/N/GUY/4Progress in the provision of technical assistance and capacity building support:Article 8.2 (b –e) was given an extended timeline of 2027, since full implementation is not feasible in the short term and would require procedural and legal changes. 8.2 b – TACB support needs include: • Enactment of relevant border procedures regulations to guide operations between bordering countries. 8.2 c – TACB support needs include: • Drafting of legislation to allow for the acceptance of results of cross border testing and common standards. • Training and development of testing facilities. 8.2 d – TACB support needs include: • Development of IT system to capture all the required information and data at the borders. 8.2 e – TACB support needs include: • Enactment of the relevant procedures regulations to guide operations. • Increased institutional capacity, infrastructure, and equipment. • Harmonisation of different systems between bordering countries. • Training for staff of the various regulatory agencies at the border. |
Articles |
8.2 (c)
View measure text |
Indicative date of implementation | 22 February 2020 |
Definitive date of implementation | 22 February 2027 |
Shift | Shift from Cat. B to Cat. C notification. |
Assistance required for implementation |
Financial and Technical Assistance required: • Drafting legislation to allow for the acceptance of results of cross border testing and common standards. • Training and development of testing facilities. |
Donor / Agency |
To be determined |
Progress reported |
9 November 2020 — G/TFA/N/GUY/4Progress in the provision of technical assistance and capacity building support:Article 8.2 (b –e) was given an extended timeline of 2027, since full implementation is not feasible in the short term and would require procedural and legal changes. 8.2 b – TACB support needs include: • Enactment of relevant border procedures regulations to guide operations between bordering countries. 8.2 c – TACB support needs include: • Drafting of legislation to allow for the acceptance of results of cross border testing and common standards. • Training and development of testing facilities. 8.2 d – TACB support needs include: • Development of IT system to capture all the required information and data at the borders. 8.2 e – TACB support needs include: • Enactment of the relevant procedures regulations to guide operations. • Increased institutional capacity, infrastructure, and equipment. • Harmonisation of different systems between bordering countries. • Training for staff of the various regulatory agencies at the border. |
Articles |
8.2 (d)
View measure text |
Indicative date of implementation | 22 February 2020 |
Definitive date of implementation | 22 February 2027 |
Shift | Shift from Cat. B to Cat. C notification. |
Assistance required for implementation |
Technical Assistance required: • Develop IT system to capture all the required information and data at the borders. |
Donor / Agency |
To be determined |
Progress reported |
9 November 2020 — G/TFA/N/GUY/4Progress in the provision of technical assistance and capacity building support:Article 8.2 (b –e) was given an extended timeline of 2027, since full implementation is not feasible in the short term and would require procedural and legal changes. 8.2 b – TACB support needs include: • Enactment of relevant border procedures regulations to guide operations between bordering countries. 8.2 c – TACB support needs include: • Drafting of legislation to allow for the acceptance of results of cross border testing and common standards. • Training and development of testing facilities. 8.2 d – TACB support needs include: • Development of IT system to capture all the required information and data at the borders. 8.2 e – TACB support needs include: • Enactment of the relevant procedures regulations to guide operations. • Increased institutional capacity, infrastructure, and equipment. • Harmonisation of different systems between bordering countries. • Training for staff of the various regulatory agencies at the border. |
Articles |
8.2 (e)
View measure text |
Indicative date of implementation | 22 February 2020 |
Definitive date of implementation | 22 February 2027 |
Shift | Shift from Cat. B to Cat. C notification. |
Assistance required for implementation |
Financial and Technical Assistance required: • Enactment of the relevant procedures regulations to guide operations. • Increased institutional capacity, infrastructure and equipment. • Harmonisation of different systems between bordering countries. • Training for staff of the various regulatory agencies at the border. |
Donor / Agency |
To be determined |
Progress reported |
9 November 2020 — G/TFA/N/GUY/4Progress in the provision of technical assistance and capacity building support:Article 8.2 (b –e) was given an extended timeline of 2027, since full implementation is not feasible in the short term and would require procedural and legal changes. 8.2 b – TACB support needs include: • Enactment of relevant border procedures regulations to guide operations between bordering countries. 8.2 c – TACB support needs include: • Drafting of legislation to allow for the acceptance of results of cross border testing and common standards. • Training and development of testing facilities. 8.2 d – TACB support needs include: • Development of IT system to capture all the required information and data at the borders. 8.2 e – TACB support needs include: • Enactment of the relevant procedures regulations to guide operations. • Increased institutional capacity, infrastructure, and equipment. • Harmonisation of different systems between bordering countries. • Training for staff of the various regulatory agencies at the border. |