Niger
Articles |
1.1.1 (a), (b), (c), (d), (e), (f), (g), (h), (i), (j)
View measure text |
---|---|
Indicative date of implementation | 31 December 2021 |
Definitive date of implementation | 31 December 2028 |
Assistance required for implementation |
1. Technical assistance in reviewing the legal framework and drafting a procedural guide. 2. Training of all focal points on the operationalization of the procedural guide and monitoring of updates and information-sharing. |
Donor / Agency | To be determined |
Progress reported | To be determined |