Sierra Leone
Articles |
7.8.1 (a), (b), (c), (d), (e), (f), (g), (h)
–
7.8.2 (a), (b), (c), (d)
–
7.8.3
View measure text |
---|---|
Indicative date of implementation | 31 December 2022 |
Definitive date of implementation | 31 December 2023 |
Assistance required for implementation |
- Assistance to conduct a feasibility study to determine the need for, and possible design of, special procedures for expedited release of air cargo (taking into account WCO immediate release guidelines). - Assistance to review and revise legislation, as necessary, to allow for simplified procedures for express consignment |
Donor / Agency | To be determined |
Progress reported | To be determined |