Togo
| Articles |
8.1
–
8.2 (a), (b), (c), (d), (e)
View measure text |
|---|---|
| Indicative date of implementation | 30 November 2019 |
| Definitive date of implementation | 31 December 2035 |
| Deadline for extension request, if required | 2 October 2035 |
| Assistance required for implementation |
• Preparation of texts establishing and organizing joint controls and one-stop border post control. • Creation of single windows with proper infrastructure facilities. • Revision of current goods import, export or transit formalities and procedures at border crossings. • Recruitment of a specialized firm to draw up the harmonized border procedures manual. • Interconnection of other customs units (customs posts and brigades in the interior) with the customs systems. • Training in and awareness-raising of new cooperation practices for border agency officials. |
| Donor / Agency |
World Bank Programme Facilitation des Echanges en Afrique de l'Ouest (2019-2024) |
| Progress reported |
15 July 2025
—
G/TFA/N/TGO/3
Soutien à l'élaboration par l'OTR d'une cartographie des processus à la frontière de Cinkasse et l'adoption d'un plan d'action visant à améliorer l'efficience et la coordination de la gestion de la frontière. Soutien à la tenue de réunions de consultation et coordination bilatérales et avec les usagers.La politique, le cadre règlementaire et les processus de gestion des risques phytosanitaires ont été revus et renforcés. Les capacités opérationnelles et techniques des agents aux frontières en charge de l'inspection des marchandises ont été renforcés. |