Égypte

1.3 - Points d'information

Articles 1.3.11.3.21.3.31.3.4
Texte de la mesure
Date indicative de mise en oeuvre 31 décembre 2021
Date définitive de mise en oeuvre 30 juin 2027
Date limite pour un report des dates, si nécessaire 2 mars 2027
Demande de report des dates
Request received
20 mai 2025
Original definitive date
31 décembre 2025
New date requested
30 juin 2027
Date approved
30 juin 2027
Reason
The national enquiry point has been put in place through a Ministerial Decree specifying the Ministry of Investment and Foreign Trade as a central enquiry point. However, the structure of the national enquiry point and the required implementation mechanisms to interconnect this central enquiry point with the different border agencies are still to be developed. To this end, Egypt is seeking financial and technical assistance and capacity building support to set up and operationalize the national enquiry point.
Committee approval:
Approuvé
Link to notification
Assistance requise pour la mise en oeuvre  Établissement du point d'information sur la facilitation des échanges et formation du personnel.
 Mise en place de l'infrastructure des TIC nécessaire et acquisition de matériel.

Étiquettes: Technologies de l’information et de la communication (TIC), Infrastructure et equipment, Ressources humaines et formation

Donateur / Agence

À déterminer

Progrès rapporté
3 mai 2024 — G/TFA/N/EGY/4  
Egypt has not received any technical assistance or capacity building in this respect. Despite the fact that each agency has its own system for handling enquiries on trade-related information in its area of competence, there is no single central TF Enquiry point linking the existing mechanisms for handling enquiries.

TACB support needs include:

• Development of a TF Enquiry point system and training of the staff.
• Establishment of ICT infrastructure and acquisition of Equipment.
Feedback