Égypte
Articles |
1.3.1
–
1.3.2
–
1.3.3
–
1.3.4
Texte de la mesure |
---|---|
Date indicative de mise en oeuvre | 31 décembre 2021 |
Date définitive de mise en oeuvre | 31 décembre 2025 |
Assistance requise pour la mise en oeuvre |
Établissement du point d'information sur la facilitation des échanges et formation du personnel. Mise en place de l'infrastructure des TIC nécessaire et acquisition de matériel. |
Donateur / Agence |
À déterminer |
Progrès rapporté |
3 mai 2024 — G/TFA/N/EGY/4Egypt has not received any technical assistance or capacity building in this respect. Despite the fact that each agency has its own system for handling enquiries on trade-related information in its area of competence, there is no single central TF Enquiry point linking the existing mechanisms for handling enquiries.TACB support needs include: • Development of a TF Enquiry point system and training of the staff. • Establishment of ICT infrastructure and acquisition of Equipment. |