Saint-Vincent-et-les Grenadines
| Articles |
7.6.1
–
7.6.2
Texte de la mesure |
|---|---|
| Date indicative de mise en oeuvre | 31 décembre 2021 |
| Date définitive de mise en oeuvre | 31 décembre 2026 |
| Date limite pour un report des dates, si nécessaire | 2 septembre 2026 |
| Demande de report des dates |
Request received
28 août 2025
Original definitive date
31 décembre 2025
New date requested
31 décembre 2026
Date approved
31 décembre 2026
Reason
St. Vincent and the Grenadines signed on to the WTO Trade Facilitation Agreement in 2017. In good faith, we anticipated that the requirement for Establishment and Publication of Average Release Times under Article 7.6 could be implemented by 31 December 2025. However, this Category C measure is unlikely to be implemented by the scheduled date.
Under a Digital Transformation Project, the World Bank is assisting with technical support from UNCTAD in establishing a Single Window for trade in St. Vincent and the Grenadines. The Single Window is expected to become operational in 2026. The Single Window would enhance the country's ability to establish and publish average release times.
St. Vincent and the Grenadines is therefore requesting an extension of one (1) year to 31 December 2026 to implement this measure.
Committee approval:
Approuvé
Link to notification
|
| Assistance requise pour la mise en oeuvre | • Assistance pour l'établissement d'un cadre juridique et réglementaire permettant une circulation fluide de renseignements et une coordination entre les organismes présents aux frontières. |
| Donateur / Agence | Pas encore de notification |
| Progrès rapporté | Pas encore de notification |